We’ve taken another step towards getting the Fairchild 24G back in the air. Below you can see the last cylinder #7 on the 145 Warner Scarab being installed, completing an extensive top overhaul at 300 hours. During the cylinder top overhaul we found we had three cracked cylinder heads, two in the exhaust port to valve guide area and one completely cracked from spark plug hole to spark plug hole. Due to our lack of machining capabilities here are the Museum, we sent all 7 cylinders down to Alan Holloway in Quincy, CA for inspection and rework. They replaced one cylinder head and welded the cracks in the remaining two cylinders. We also installed new intake valves and piston rings in all 7 cylinders, our exhaust valves were all well with-in servicable limits. Allan Holloway’s services are highly recommended and they are good people to work with.

An A&P’s view of installing the intake tube on cylinder #6.

The 145 Warner Scarab is finally complete. It awaits vavle adjustment, spark plugs, harnes installtion, NACA cowl brackets, and run-in time. Next we’ll be completing the annual inspection and reassembly of the rest of the aircraft for test flight.
